Aerogel-based materials replace the insulation boards of molding machines.
In 2024, YUTOECO Kunshan - YJ implemented a project to replace the insulating boards on molding machines with aerogel-based materials. By using molecular insulation materials to separate the mold and the molding base, the project effectively reduced heat loss by approximately 79 kWh per day per machine. In total, this project reduced greenhouse gas emissions by 769 tons in 2024.
Printer Water Tank Cooling
Shenzhen YUTO Longgang Branch has invested in two closed-loop cooling towers to reduce the frequency of replacing cooling towers and packing, effectively lowering maintenance labor costs and downtime caused by repairs. According to the project statistics, this initiative saves 9,600 minutes of manual cleaning and maintenance time, reduces 5 kW of power consumption, and cuts costs by approximately 50,000 CNY.
YUTO Longguang Energy Saving Projects
Shenzhen YUTO Longgang Branch took multiple measures to effectively reduce energy consumption.
· The air compressor output pressure reduction project effectively reduced annual electricity consumption by 130,000 kWh.
· Longgang Brach retrofitted the central air conditioning system for remote control, and enabled timely on/off switching and temperature adjustments based on ambient conditions, saving an annual electricity consumption of 60,000 kWh.
· By replacing the fluorescent lights with energy-efficient LED lights, a total of 2,745 LED lights will be installed within the year, saving an annual electricity consumption of approximately 90,000 kWh, and saving a total cost of 57,000 CNY.
Air compressor energy saving
YUTO Xuchang implemented a technological renovation to recover and reuse the compressed heat from air compressors in the factory, using it to heat domestic water and provide heating for the air handling unit. This project saves energy for the dormitory water heating unit and air handling unit heating. It can save 656,600 kWh of electricity annually and reduce carbon dioxide emissions by 381 tons.
Circulating Water Pump for Central Air Handling
Shenzhen YUTO Longgang Branch has successfully replaced two 45KW power frequency pumps with one 37KW variable frequency pump through replacing pipelines, valves, pump bodies and electrical circuits with those technically improved alternatives, thereby reducing energy consumption and noise. Based on an operation time of six months per year, this project can save over 190,000 CNY annually.